Customization: | Available |
---|---|
Warranty: | 1 Year |
Place of Origin: | Qingdao, Shandong |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cross lapping machine for Nonwoven wadding thermal bonding production line
Function
This system is used for individualization of fibers to web and it is suitable for many different fiber materials ,PET,PP,PA ,4080 low melt point fiber,and so on.
Technicial Data
Feature
1. High quality anti-static carbon type aprons, light-weight rollers. l
2. It utilizes servo motor & servo controller system or inverter with web storage and profiling function to keep the web thickness uniformly. l
3.Servo motor central controlling system and PLC touch screen interface.
4.This provides high quality web controlled by computer to ensure quality as well as speed.
7.Radial pulsation is less than 0.02mm
We are professional nonwoven machine many years, in order that we can supply the exact price and corresponding technical data, please kindly confirm your details requirement as follows:
1. What's the final products?
2. What's the width of the products?
3. What's the Gsm( grams per square meter )and thickness of products?
4. What's the material you used? And what's the specification of the raw material?
5. What's the capacity you need?
6. Do you have any pics or samples of our final products?
1.Warranty
The warranty period shall be valid for 12 months after completion of the commissioning. During the warranty period, if any defect and fault is discovered, XinLihua grants a prompt action to solve the problem.
2.Installation & maintenance
Paragon will send one or two engineers to the Buyer's factory to help the Buyer for the installation and commissioning of the production line at the request of the Buyer. The Buyer should provide the allowance , round-trip air tickets, accommodation, workers and translator. The installation and commissioning will take around 15 days to one month according to different production lines.