New Designed Cotton Seed Separate Ginning machine
Function:
Separate the seeds from Cotton, Requirements in the process of crimped wire does not damage the quality of the cotton fiber and cotton seed.
Working Principle:
Using high speed rotating (peripheral speed about 12 ~ 13 m/s) of the disk saw blade through rib gap pull hook cotton fiber.
Features:
1)Safety: The design of the machine is beautiful and practical,simple transmission, small vibration.
2)Easy installation: The machine only need to be placed in the hard ground, don't need fixed machine feet and small footprint.
3)Easy to use: The first step is to put cotton, the second step is to start the motor.And the last is close the work box.
Model |
PM-GM20 |
PM-GM25 |
Output/ lint cotton |
70-80 kg/h |
80-100kg |
Total power |
5.1kw |
5.1kw |
Blade Dia. |
Dia.320mm |
Dia.320mm |
Height of blade protruding from the rib |
30-35mm |
30-35mm |
Saw blade inserted into brush |
2-3mm |
2-3mm |
Gap between brush and rear windshield |
1-2mm |
1-2mm |
Machine size |
1370*760*1320mm |
1430 x 900x 1320 mm |
Machine weight |
650kgs |
780kgs |
We are professional nonwoven machine many years, in order that we can supply the exact price and corresponding technical data, please kindly confirm your details requirement as follows:
1. What's the final products?
2. What's the width of the products?
3. What's the Gsm( grams per square meter )and thickness of products?
4. What's the material you used? And what's the specification of the raw material?
5. What's the capacity you need?
6. Do you have any pics or samples of our final products?
1.Warranty
The warranty period shall be valid for 12 months after completion of the commissioning. During the warranty period, if any defect and fault is discovered, XinLihua grants a prompt action to solve the problem.
2.Installation & maintenance
Paragon will send one or two engineers to the Buyer's factory to help the Buyer for the installation and commissioning of the production line at the request of the Buyer. The Buyer should provide the allowance , round-trip air tickets, accommodation, workers and translator. The installation and commissioning will take around 15 days to one month according to different production lines.