Customization: | Available |
---|---|
Warranty: | 1year |
Application: | Nonwoven Production Line |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.The card is of modular design allowing for ease of transport and installation.
2.It is mounted normally on an 800mm width platform with CE/UL approved walkways allowing for ease of observation and access as required in a safe manner.
3.There is a metal detect system fitted whereby the feed rollers are designed to detect metal and will automatically go into reverse for several seconds to reverse any metal away from the card licker-in. 4.Main cylinder equipped with emergency brake system.
All card main cylinders and main rollers are manufactured in a controlled manner in house and are all dynamically balanced prior to installation.
5.All drives are variable speed and synchronized to allow for full automatic control of machines prior to and after the carding system.
Total sealing of all rollers prevents fiber causing issues with bearing wrap ups.
6.All covers are laser cut to give perfect fit and all of them are raised/ lowered by means of air soring and electrical pusher.
7.Electronic locking and safety protection of the whole machine is standard and complies with UL/CE requirements.
1.Warranty
The warranty period shall be valid for 12 months after completion of the commissioning. During the warranty period, if any defect and fault is discovered, XinLihua grants a prompt action to solve the problem.
2.Installation & maintenance
Paragon will send one or two engineers to the Buyer's factory to help the Buyer for the installation and commissioning of the production line at the request of the Buyer. The Buyer should provide the allowance , round-trip air tickets, accommodation, workers and translator. The installation and commissioning will take around 15 days to one month according to different production lines.